Large Building Construction
|
|
Solutions for Large Building Construction |
 |
 |
 |
|
Large construction projects rely on solutions from Leica Geosystems to complete work efficiently and accurately.
|
|
 |
 |
|
 |
|
 |
“HDS and Cyra's software tools provided an easy way to accurately identify differences between actual construction and our design model of this complex, exacting facility. Using these tools, the client successfully avoided significant field-related construction conflicts that would otherwise have led to schedule extensions and additional project costs."
Randy Carbone, Senior Supervising Designer, Parsons Corp. mere
|
 |
 |
 |
 |
|
 |
|
 |
“The sooner you catch dimensional construction errors, the better. The last thing you want to see toward the end of a project is some guy up on the 22nd floor with a welding torch. DEI’s use of Cyrax for construction QA gave us a lot of valuable geometry information, which in turn helped
us to reduce risk on the project and meet schedule without any fit-up problems.”
Rob Hudson, Senior Superintendent of Construction, Ryan Companies US, Inc mere
|
 |
 |
 |
 |
|
 |
|
 |
“With Cyrax we quickly obtained details that made our 3D model more accurate and realistic.”
V.P. Surveying, Lamp Rynearson & Associates
“There is no question in my mind that having animation really made a difference
in our fundraising.”
Dr. Lee G. Simmons, DMV, Director, Henry Dooly Zoo mere
|
 |
 |
 |
 |
|
 |
|
 |
Customers around the world are finding out firsthand how the RUGBY 100 is setting the standard for general construction lasers. mere
|
 |
 |
 |
 |
|
 |
|
 |
Projecting side stands, spiralshaped multi-tier access ramps and the magnificent curved roof structure over the side stands are the distinguishing architectural features of Stadium Australia which visitors notice as they arrive.
In this picture building surveyor Neville Thomson is checking the positions of the huge concrete abutments. Their anchorings were determined in 1998 using Leica Geosystems’ measuring technology. mere
|
 |
 |
 |
 |
|
 |
|
 |
Millions of people have seen it in books and on postcards; millions more have seen it at first hand during a visit to Australia. Survey engineer Steve Denning also knows it from above and below: a quartercentury after the Opera House was inaugurated, his know-how was needed to assess the effects of weather and sea-water on the structure, and fix the wear and tear. The initial task was to restore the granite promenade surrounds and sea wall of the Opera House. mere
|
 |
 |
 |
 |
|
 |
|
 |
It’s not really the application developers had in mind when they introduced the powerful, speedy and accurate Leica one-man robotic survey system – nor did they envision that one man might have reason to operate two at the same time. But that’s exactly what happened during three
surprising weeks this summer on the North Carolina shores during the historic Cape Hatteras Lighthouse relocation. mere
|
 |
 |
 |
 |
|
 |
|
 |
What is recognized today as the highest building of Saudi Arabia started in April 1997. mere
|
 |
 |
 |
 |
|
 |
|
 |
With its 300 metre height, the distinctive feature of the new Commerzbank
high-rise office block in Frankfurt, which towers over all other buildings in this world famous banking city, is not just its imposing height. The London firm of architects, Sir Norman Foster and Partner, chose for the giant building, a triangular form, each side of which has a length of 60 metres. mere
|
 |
 |
 |
|
 |
|
|
|
|